Sunday, February 17, 2013

Stone Benchtop Replacement


The stone benchtop supplier has come good on their promise to replace the stone benchtop in the main bathroom which was firstly too long and then too short. It's been replaced and the size is perfect!

To their credit they also did it in the timeframe that was requested by the builder too - two days. Good work. The plumber is coming in on Monday so they needed to have the benchtop reinstated before then.


The new benchtop is now perfectly flush with the cabinetry, as intended by Daryl Wark, the interior designer who did the cabinetry design. His idea was for the cabinet to "float" in the space, that's why it's wall hung.


The vanity outside the toilet has also been moved forward so that the benchtop is now flush cabinetry. There doesn't seem to be any damage to the cabinetry at all which is fantastic.


The tilers are still to finish re-tiling the space so the bill for that is not yet finalised. While the stone benchtop suppliers have fulfilled their first promised to replace the benchtop but we'll have to wait to see if they fulfil their promise to pay for the labour. I'm quietly optimistic, but only then will we be able to close that chapter.


No comments:

Post a Comment